LEARNING

We design new school buildings, and manage the upgrades that keep schools running.

100+

school projects delivered since 2017

$60K-$8M

range of project values

VSBA · MACS

delivering for the Victorian School Building Authority and Catholic schools

TWO WAYS WE WORK WITH SCHOOLS

School architecture

New buildings, master plans and major refurbishments, designed with the school community. We take a project from the brief and site analysis through design, permits and documentation to construction.

School works

Maintenance, compliance and upgrade projects for the VSBA and MACS. We act as design consultant and project manager, from scoping to handover, while the school stays open.

CASE STUDY · SCHOOL ARCHITECTURE

St Simon's Primary School, Rowville

A new learning building with 12 classrooms arranged around flexible learning spaces and breakout areas, opening directly onto a covered outdoor learning area. We also modernised the existing library and added a sensory garden, then returned in 2022 to design the school's new outdoor landscape.

Client

St Simon’s Primary School

Our role

Principal design consultant

Building completed

2019

Landscaping

2022

SCHOOL WORKS

What we deliver

  • Ramp compliance and accessible access works

  • Toilet and amenities refurbishments

  • Covered outdoor learning areas (COLAs)

  • Compliance and accessibility upgrades

  • Planned maintenance works

  • Library and classroom refurbishments

  • Master planning for school site

We act as principal design consultant and project manager under VSBA programs including PMP, ABP, EMP and minor capital works, and for Catholic schools through MACS.

How we work

Site investigation

We meet the school and the VSBA project officer on site, assess existing conditions and agree the scope.

Design and cost plan

Schematic design and a cost plan for the school to endorse before documentation starts.

Tender and contract

Construction documents, tender, evaluation and recommendation, and the contract ready to sign

Delivery in a live school

Fortnightly site meetings, progress reports and claims, through to practical completion and defects.

Safety in a working school

  • Works staged around school hours and terms, with drop-off and pick-up kept clear

  • Every contractor holds a Working With Children Check and follows the school induction

  • No contact between contractors and students; site instructions go through us

  • Building zones barricaded and monitored, with advance notice of disruptive works

CASE STUDY · SCHOOL WORKS

Engaged by the VSBA to refurbish the student amenities building next to the library: new student toilets and an accessible toilet, a redesigned outdoor wash area and renewed external walls.

Wantirna South Primary School

First site visit

March 2024

Completed

January 2025

Budget

$449K

Final cost

$364K, under budget

RAMP COMPLIANCE PROGRAMME

77

schools, in ten VSBA bundles, since 2023

We audit each entry against AS 1428.1, design ramps, landings and handrails that suit the building, and manage the builder through to handover, a bundle of schools at a time, with each school open as usual.

Selected school works

Eight of more than 100 school projects. Values are project budgets.

Whitfield District Primary School · Accessible buildings works, main building and toilets · 2026 · $463K

South Gippsland Specialist School · Decking and access ramps · 2026 · $420K

Elsternwick Primary School · Accessible buildings works across eight areas · 2025 · $382K

Wantirna South Primary School · Amenities refurbishment · 2025 · $449K

Langwarrin Park Primary School · Entry, carpark and ramp works · 2026 · $259K

Camelot Rise Primary School · Entry, driveway and ramp works · 2026 · $245K

Amsleigh Park Primary School · Accessible buildings works · 2026 · $147K

Malvern Valley Primary School · Site access works · 2025 · $105K